Area schedule
A finish and quantity per room or zone, not one lump figure, so phases can be priced and released independently.
A square-foot rate on its own does not describe a commercial scope.
A finish and quantity per room or zone, not one lump figure, so phases can be priced and released independently.
Who tests slab moisture, to which method, against which product limit, and who carries the risk if the reading fails.
The permitted deviation the finish product requires, and whether levelling compound is in the base scope or a provisional sum.
Which areas can be closed, on which days, between which hours, and whether after-hours or weekend labour is assumed.
Where flooring sits against drywall, paint, millwork, mechanical and final cleaning, and what protection is required afterwards.
The contractor package your building asks for. Send the list with the tender and we will respond to it item by item.
Measure by zone, record existing finishes, transitions, door swings, thresholds and the route materials will travel.
Look at the slab or structural deck, joints, cracks, old adhesive and moisture risk before a product is confirmed.
Split the floor into releasable areas, set work windows and agree how occupied zones stay usable in between.
Complete each phase, protect finished areas, and provide product data and maintenance guidance for the installed system.
Below -5C the City of Calgary spreads pickle, a mix of 3 per cent salt and 97 per cent fine gravel. That gravel walks in on boots all winter and abrades entry lanes, so matting length and wear layer matter more here.
Expansive clay is widespread around Calgary, and floor slabs move with it far more than footings do. Cracked and heaved slab-on-grade is a real planning item on ground-floor commercial space.
Most commercial work happens around staff, tenants or customers. Noise limits, adhesive odour, dust containment and safe temporary transitions are priced scope items, named in the tender alongside the finish.
Flooring Experts Calgary installs commercial flooring in offices, retail units, restaurants, clinics, gyms, shops and warehouses across Calgary and the surrounding communities. The materials overlap with residential work, but almost nothing else about the job does.
A house is measured once and installed in a run. A commercial floor is measured by zone, because the zones get released at different times and often to different finishes. A single tenancy can carry broadloom carpet tile in the open plan, luxury vinyl tile through circulation, sheet vinyl in a wet room and a resin coating in a back-of-house area, each with its own preparation.
The substrate carries more weight commercially. Resilient sheet, plank and resin systems all publish moisture limits for the slab they sit on, and they publish a flatness tolerance the installed floor has to meet. Meeting that tolerance across a large floor plate frequently means levelling compound, and levelling compound is a real cost, so it belongs in the tender as a defined quantity or a stated provisional allowance rather than a surprise at week two. Levelling sits in a planning range of roughly $2-$6 per square foot and floor removal in the range of $1-$3 per square foot, both in Canadian dollars and both before site conditions are seen.
The other difference is that a commercial floor has neighbours. Adhesive odour, grinder dust, noise and blocked corridors all land on somebody who is trying to work.
Phasing is the part that gets underestimated. A workable phase plan names the zones, the order, the closure length for each and the temporary condition in between: how people cross a half-finished corridor, where the hoarding sits, which doors stay live and what the exit route is while an area is out of service.
It also has to fit around the rest of the trades. Flooring is a late finish, so it inherits every upstream delay, and it is then walked on by whoever comes after. Agreeing who protects the finished floor, with what, and for how long, prevents the most common argument on a fit-out.
Loading and waste matter too. Old carpet, tile and adhesive come out of a building through the same dock and lift everyone else is using, and disposal volumes on a commercial floor are large enough to need a booked bin rather than a truck run.
Two local conditions are worth designing for. Slab-on-grade space sits on expansive clay across much of the region, and floor slabs move with that clay considerably more than footings do, which is why a ground-floor or basement commercial slab gets assessed before a rigid finish or a coating is committed to. And every entry in the city takes a winter of pickle grit, the 3 per cent salt and 97 per cent gravel mix the City spreads below -5C, which is abrasive underfoot and shortens the life of whatever is nearest the door.
Where a project touches permitted construction, the enforceable code in Alberta is the National Building Code 2023 Alberta Edition, in force since May 1, 2024. We install to the drawings and specifications issued under it.
Property managers and general contractors normally ask a flooring subtrade for a documentation package before site access is granted. That list varies by building and often includes insurance, WCB Alberta clearance, a safety plan, a hazard assessment, product data sheets and adhesive information. Send your list with the tender and we will answer it item by item rather than guess at what your building wants.
Where the building permits after-hours or weekend access, yes. It needs to be agreed at tender, because evening and weekend labour, security escorts and elevator bookings all change the price and the programme.
Not usually. Most commercial floors are installed in phases, with one zone closed and hoarded while the rest stays in use. The phase map should be agreed before the first area is released.
It should be named in the contract. Resilient and resin products publish their own moisture limits, and a failed reading changes the specification, so agree the method, the responsibility and the remedy in advance before materials are ordered.
Send us the package your building requires with the tender, including insurance, safety and product submittals. We will answer that list directly rather than send a generic bundle.
No. Commercial scopes carry phasing, after-hours labour, protection, disposal, higher-specification products and coordination time. Residential square-foot ranges are not a reliable guide for a tenant improvement or industrial floor.
Yes. We are comfortable working as a subtrade to a general contractor, to a construction manager, or directly for a landlord or business owner on a smaller replacement.